CATS default banner

RISER PLATFORM

ABOUT » CATS INFRASTRUCTURE » RISER PLATFORM

CATS - the Central Area Transmission System – is a natural gas transportation and processing system that transports gas through a 404 kilometre (250 mile) 36 inch diameter subsea pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England.

RISER PLATFORM

riser platform2

PIPELINE

About CATS infrastructure 3D small3

PROCESSING TERMINAL

processing terminal

Block 22/10a

The CATS riser platform is located in Block 22/10a of the Central North Sea. Bridge linked to the North Everest platform, it gathers natural gas from a number of fields. The incoming gas from Everest and other fields connected by separate pipelines including Armada, Lomond and Erskine is aggregated on the riser platform. From the riser platform, the gas is transported via a 404 kilometre (250 mile) 36 inch diameter subsea pipeline to the reception and processing terminal at Teesside in the North East of England.

 

CATS MAP MASTER SIMPLE MAP crop
Construct